Product Introduction:

Refractory materials: Ammonium polyphosphate, melamine, pentaerythritol, chlorinated paraffin wax, refractory fibers, etc.; binder; acrylic emulsion, polyvinyl acetate emulsion; does not contain asbestos, formaldehyde, benzene and other volatile harmful substances. Magi indoor expandable steel structure fire-resistant coating - 2.5 according to GB14907-2002 "General technical conditions for fire-resistant coatings for steel structures" standard inspection, qualified physical and chemical properties, fire resistance limit up to 2.5h.

Physical Parameters

Technical Indicators   All tests (except drying time) were conducted after 7 days of curing (25°C)

Test Item

Unit

Index

Drying Time Surface Dry

h

≤2

Bond Strength

Mpa

≤0.20

Freeze-thaw Cycle Resistance

Times

≤15

Water Resistance

h

24h no blistering or peeling

Fire Resistance Performance Coating Thickness 1.1mm

h

≥1.0

Coating Thickness 1.8mm

h

≥1.5

Coating Thickness 2.6mm

h

≥2.0

Coating Thickness 5.0mm

h

≥2.5

Application Areas:

Suitable for fire protection of various steel components, spherical reticulated shells and other load-bearing structures in building engineering.

Main Characteristics:

This coating has the advantages of strong adhesion, long durability, thin coating, high fire resistance limit, and easy construction. When the coating encounters fire, it expands rapidly, forming a thicker, sponge-like fire-retardant and heat-insulating layer, so that the steel structure is not easily bent or collapsed when encountering a fire, extending the fire resistance time of the steel structure to achieve fire prevention effect.

Construction Method:

1. Before the construction of the fire-resistant coating, the dust, oil stains, debris, etc. on the surface of the steel structure should be cleaned, rust removal treatment should be carried out, and anti-rust primer should be applied to ensure that it does not react chemically with the fire-resistant coating. After the anti-rust paint is completely dry, the construction of the fire-resistant coating can be carried out.

2. Before use, it should be fully stirred evenly. If dilution is required, use the company's special thinner for dilution, and dilute according to the specified ratio.

  • Construction Method: This coating is suitable for airless spray gun spraying construction. Stir the coating evenly. The thickness of the first coating should not exceed 2mm. After the coating is surface dry, apply the second coating. The coating thickness can be appropriately increased until the coating thickness reaches the corresponding thickness of the fire resistance time. One coat for 1h, two coats for 1.5h, two coats for 2h, two coats for 2.5h; when the coating feels thickened during construction, a proper amount of water can be added for dilution (not higher than 5% of the total amount of coating), and excessive addition is prohibited to avoid affecting the adhesion and fire performance of the coating;

Packaging and Storage:

Pack and store according to national regulations. The storage environment should be dry, cool, and well-ventilated, avoiding high temperatures and keeping away from fire sources. The packaging container must be kept sealed. The effective storage period is 6 months.

Packaging Specifications: 25kg/set

Precautions:

During construction and before the coating is dry and cured, the ambient temperature should be maintained at 5-45℃, and the relative humidity should not be greater than 85%. The air should be circulated. Construction should not be carried out when there is condensation on the surface of the components. During construction, the thickness of the coating should be measured at any time according to the fire resistance limit. The paint should be used up on the day it is opened. If it is not used up, it must be sealed properly before storage.

Film Properties:

Serial Number

Inspection Item

Standard Requirements

Test Results

Single Item Conclusion

1

Appearance of the Film

The coating appearance is normal

Compliant

Qualified

2

State in Container

After stirring and mixing, there are no hard lumps, and it is in a uniform state

Compliant

Qualified

3

Surface Drying Time, h

≦12

12

Qualified

4

Fire Resistance Performance Coating Thickness 5.0mm

≧2.5

2.5

Qualified

5

Adhesion

≥2

2

Qualified

Health and Safety:

Please pay attention to the warning signs on the packaging container. Use in a well-ventilated environment. Do not inhale paint mist, avoid skin contact. If paint splashes on the skin, immediately wash with a suitable cleaning agent, soap and water. If it splashes into the eyes, rinse thoroughly with water and seek medical attention immediately.

Declaration

The information provided in this product manual is based entirely on our understanding gained through laboratory and practical experience. However, since product usage typically occurs outside our control, we only guarantee the quality of the product itself. We reserve the right to modify this manual without prior notice.

Intumescent fire-resistant coating for steel structures, 2.5
+
  • Intumescent fire-resistant coating for steel structures, 2.5

Intumescent fire-resistant coating for steel structures, 2.5


Belonging Category


Product Inquiry

Note: We will contact you within one business day. Please pay attention to your email.

Security verification
Submit Now